Covenant United Methodist Church
Springfield, PA
Faced with the challenge of concealing air conditioning ductwork in a tudor style nave, false beams were constructed around new soffits. The lines of the trusses were carried down to the original spring block. Phase II, currently underway, is to design a new Narthex between the sanctuary and the education wing.







